Base model : Porosity map (layer 1) including history wells locations (t1)
Base model : Porosity map (layer 1) including history wells locations (t1)

UNISIM-I-D: Case Study for Selection of Production Strategy

The case study was organized by Gaspar, A.T., Maschio, C., Santos, A.A., Avansi, G.D., Filho, J.H. and Schiozer, D.J. (2013).
The comparative study should consider deterministic and probabilistic approaches.



UNISIM-I-D Update

Section with updated information and questions : uiq

Source files
UNISIM-I-D:      
study description UNISIM-I-D.pdf 07-MAY-2015 updated
dataset - uncertainties UNISIM-I-D-uncertainties.zip 26-SEP-2013  
dataset - deterministic (IMEX)
UNISIM-I-D-deterministic.zip 24-SEP-2013  
dataset - history data t1 UNISIM-I-D-HistoryData-t1-2013-OCT-01.zip 01-OCT-2013 updated
dataset - probabilistic (IMEX)
UNISIM-I-D-probabilistic.zip 02-OCT-2013 new
dataset - Annex-A Annex-A_AdditionalInformation_CF.pdf 13-MAY-2014 updated
dataset - Annex-B Annex-B_AdditionalInformation_ProductionSystem.pdf 10-SEP-2015 updated
dataset - deterministic (ECLIPSE) UNISIM-I-D-deterministic-ECLIPSE.zip 25-SEP-2014 new